RUFFWEAR Knot-a-Long Lead Short Dog Lead with Carabiner Clip, Length: 0.76 m, Aurora Teal

$90.24

& Free Shipping

Free shipping!

  • No-Risk Money Back Guarantee!
  • No Hassle Refunds
Guaranteed Safe Checkout

The Ruffwear Knot-a-Long dog lead is extremely robust, climbing inspired and has a length of 0.76 m (30 inches). This short leash is made of strong, flexible core sheath rope and a secure locking carabiner, similar to our longer knot-a-leash. The short length is great for keeping your dog close and can be perfectly combined with our double track coupler. The reflective rope ensures that both dog and human are always clearly visible in low light conditions. The handle is made of tubular webbing that fits comfortably and easily in the hand during long and short walks. A practical accessory loop allows you to attach bags or small tags. To clean, hand wash with mild detergent and allow to air dry.”
The short lead is ideal for keeping dogs in the city or on the lead during training. Climbing inspired design ensures long-lasting comfort and safety
The tubular textile handle offers a high level of comfort even with pulling dogs. Highly visible, reflective details as well as accessory loop for hanging bags and items
The lockable metal carabiner hook provides a secure hold on the collar or harness. The short length is ideal for use with the Ruffwear Double Track Coupler
Our guarantee promise “Trail Tested” – All our products have undergone rigorous practice tests, we therefore offer you a manufacturer warranty against material and processing defects

Price: $90.24
(as of Sep 09,2023 18:55:13 UTC – Details)



The Ruffwear Knot-a-Long dog lead is extremely robust, climbing inspired and has a length of 0.76 m (30 inches). This short leash is made of strong, flexible core sheath rope and a secure locking carabiner, similar to our longer knot-a-leash. The short length is great for keeping your dog close and can be perfectly combined with our double track coupler. The reflective rope ensures that both dog and human are always clearly visible in low light conditions. The handle is made of tubular webbing that fits comfortably and easily in the hand during long and short walks. A practical accessory loop allows you to attach bags or small tags. To clean, hand wash with mild detergent and allow to air dry.”
The short lead is ideal for keeping dogs in the city or on the lead during training. Climbing inspired design ensures long-lasting comfort and safety
The tubular textile handle offers a high level of comfort even with pulling dogs. Highly visible, reflective details as well as accessory loop for hanging bags and items
The lockable metal carabiner hook provides a secure hold on the collar or harness. The short length is ideal for use with the Ruffwear Double Track Coupler
Our guarantee promise “Trail Tested” – All our products have undergone rigorous practice tests, we therefore offer you a manufacturer warranty against material and processing defects

Recently Viewed Products

Shopping Cart
RUFFWEAR Knot-a-Long Lead Short Dog Lead with Carabiner Clip, Length: 0.76 m, Aurora TealRUFFWEAR Knot-a-Long Lead Short Dog Lead with Carabiner Clip, Length: 0.76 m, Aurora Teal
$90.24
Scroll to Top
Scroll to Top